Getting a new electricity connection in Pakistan is now mostly an online process. All DISCOs — LESCO, MEPCO, FESCO, IESCO, GEPCO, PESCO, HESCO, SEPCO, QESCO, TESCO and HAZECO — use the Electricity New Connection (ENC) system, which you can reach from your DISCO's official website.
This guide explains the steps, the documents you need, and what happens after you apply.
Fees, forms and requirements are set by your DISCO and can change. Check the latest requirements on your DISCO's official website or at your sub-division office.
Quick summary
- Open your DISCO's website and go to New Connection (ENC system).
- Fill in the online application with your CNIC and property details.
- Upload or attach the required documents.
- Submit and print the application; submit documents if your DISCO asks for physical copies.
- After verification, receive a Demand Notice.
- Pay the Demand Notice at the designated bank or payment channel.
- Meter is installed and your connection is energised.
Not sure which company serves your area? See: DISCOs in Pakistan: Complete List.
Choosing the right connection type
- Tariff category: A-1 residential (homes), A-2 commercial (shops, offices), B industrial, D agricultural, and others.
- Single-phase or three-phase: Most small homes start with single-phase. Larger homes with several air conditioners or a higher sanctioned load often need three-phase.
- Sanctioned load: Apply for a load that matches your expected appliances. Under-declared load can cause problems later.
Getting the right tariff category matters: a home on a commercial tariff pays more per unit and higher taxes. See: Electricity Unit Price in Pakistan 2026.
Documents usually required
For homes and shops:
- Attested copy of the applicant's CNIC
- Proof of ownership of the property (for example, registry or allotment letter)
- If there are multiple owners, a power of attorney or consent in the applicant's favour
- Affidavit on stamp paper confirming no existing connection or outstanding dues at the premises (as required by the DISCO)
- Tenants: an NOC from the owner on stamp paper
- Witness CNICs — often required for three-phase or larger connections; DISCO rules vary
- Wiring test report from a licensed electrical contractor, where required
For industrial or company connections, additional documents are usually needed, such as a site plan, company registration documents, directors' details and board resolution.
Step-by-step application
- Open the ENC system. Go to your DISCO's official website and click "New Connection" or "ENC".
- Select your DISCO and connection type.
- Enter applicant and premises details — CNIC, name, address, nearest reference number of a neighbouring connection (helps locate the area), tariff and load.
- Upload documents as instructed.
- Submit and save your application/tracking number.
- Print the application if the DISCO asks for physical submission, and deliver it with attested copies to the concerned office.
- Site survey. DISCO staff may visit to check the site and feasibility.
- Demand Notice. After verification, the DISCO issues a Demand Notice with the charges (connection charges, security deposit and other applicable costs).
- Pay the Demand Notice through the designated bank or channel and submit proof of payment if required.
- Installation. The meter is installed, and your first bill is issued with a new reference number.
You can usually track the status of your application online with your tracking number or CNIC.
How long does it take?
Timelines depend on the DISCO, the area, the load and whether new infrastructure (such as a transformer) is needed. Simple single-phase residential connections are typically quicker than three-phase or industrial connections. NEPRA's consumer service rules set expectations for DISCO performance; if your application is delayed without reason, follow up with the office and, if needed, file a complaint.
See: Electricity Bill Complaint: How to Report Overbilling and Service Problems.
Avoid these common mistakes
- Using agents who promise "fast" connections for extra money. Apply through official channels only and pay only through the official Demand Notice.
- Wrong tariff. Do not apply for commercial if the premises is a home.
- Incomplete documents. Missing or unattested documents are the most common reason for rejection or delay.
- Outstanding dues at the premises. If an old connection at the same address has unpaid dues, a new connection may not be approved until they are cleared.
After you get the connection
- Note your 14-digit reference number from the first bill. See: 14-Digit Electricity Reference Number Explained.
- Register in the Power Smart app to submit your own meter readings. See: Apna Meter Apni Reading App Guide.
- Thinking about solar? Read: Net Metering Application Basics.
Frequently asked questions
Can a tenant apply for a connection? Usually yes, with an NOC from the owner, but DISCO rules vary.
Can I get a temporary connection for construction? DISCOs offer temporary connections for construction and events, with separate requirements and tariffs.
What if my application is rejected? Ask for the reason in writing, correct the documents and re-apply.
Official reference